Rust-Oleum Project

Re-Coating Your Asphalt Driveway

Browse Projects

  • Father's Day Tool Caddy
  • Top Notch Tool Shop
Driveway coated with blacktopAfter
  • Estimated Project Time:

    2 Days

  • Challenge Level:


  • Tools & Supplies:

    • 9 Inch Roller Frame with Extension Handle
    • Mixing Stick
Driveway coated with blacktop After
  1. Clean the entire driveway surface making sure it is free of dirt, debris, oil and grease spots. Trim any grass or weeds overgrowing on to the driveway.
  2. Scrape clean all cracks and holes using a screwdriver or wire brush.
  3. Remove remaining dirt, dust and debris by sweeping with a broom.
  4. Rinse entire driveway with fresh water and allow surface to dry.
  5. Repair major cracks and/or holes prior to coating with EPOXYSHIELD® Blacktop Patch & Crack Filler (follow product instructions for use)
  6. Once the driveway is properly cleaned and all holes/cracks have been repaired, apply the Rust-Oleum® EPOXYSHIELD® Blacktop Coating onto driveway.
  7. Apply coating with long handled roller in 4'x4' sections. Cross-roll using perpendicular strokes in each section for better coverage.
  8. Let dry for 1 hour prior to foot traffic and 4 hours prior to car traffic.
  9. *Apply between 50°F-90°F (no rain forecasted for 48 hours)

Customer Reviews

Be the first customer to review this product!

This content comes from a hidden element on this page.

The inline option preserves bound JavaScript events and changes, and it puts the content back where it came from when it is closed.

Click me, it will be preserved!

If you try to open a new Colorbox while it is already open, it will update itself with the new content.

Updating Content Example:
Click here to load new content